Design Development

FRONT AND AERIAL VIEWS

Where we are Now...

The design team incorporated the budget reduction changes, and continued to develop the design with the 4J teachers, principal, and administrators.


See up-to-the-minute developments with an on-site web cam.

At the end of the Schematic Design phase, the project information was sent to an independent cost consultant to determine the probable cost of the new school. As with most projects, the cost was a bit too high and the team made some modifications in order to reduce cost and make the best use of bond monies.